Question 71.

Pick up the correct statement from the following:

A.

 The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value

B.

 The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost

C.

 The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval

D.

 All the above

Explanation :

Explanation Not Provided

Question 72.

Pick up the correct statement from the following:

A.

 The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies

B.

 Additional supervising staff engaged at work site, is called work charged establishment

C.

 Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item

D.

 All the above

Explanation :

Explanation Not Provided

Question 73.

Referring of given figure, pick up the correct statement from the following:

A.

 The total length of centre line of four walls is 20 m

B.

 Length of long wall out-to-out is 6.80 m

C.

 Length of short walls in-to-in is 3.20 m

D.

 All the above

Explanation :

Explanation Not Provided

Question 74.

The height of the sink of wash basin above floor level is kept

A.

 60 cm

B.

 70 cm

C.

 75 cm to 80 cm

D.

 80 cm

Explanation :

Explanation Not Provided

Question 75.

The unit of measurement is per quintal for the following:

A.

 Collapsible gates with rails

B.

 Rolling shutters

C.

 Expanded metal wire netting

D.

 M.S. reinforcement of R.C.C. works

Explanation :