Estimating and Costing Multiple Choice Questions

Estimating and Costing

Question 76.

The slope of the outlet of 'P trap' below the horizontal is kept

A.

 8°

B.

 10°

C.

 12°

D.

 14°

Explanation :

Explanation Not Provided

Question 77.

The expected out turn for earth work in excavation in ordinary soil per workman per day is

A.

 1.00 cum

B.

 2.00 cum

C.

 3.00 cum

D.

 4.00 cum

Explanation :

Explanation Not Provided

Question 78.

The weight of an item is measured correct to nearest

A.

 0.25 kg

B.

 0.50 kg

C.

 0.75 kg

D.

 1.00 kg

Explanation :

Explanation Not Provided

Question 79.

The expected out turn of 2.5 cm cement concrete floor per mansion per day

A.

 2.5 sqm

B.

 5.0 sqm

C.

 7.5 sqm

D.

 10 sqm

Explanation :

Explanation Not Provided

Question 80.

Cost of fittings and their fixing is specified for the following sanitary fittings

A.

 Water closets

B.

 Flushing pipes

C.

 Lavatory basins

D.

 All the above

Explanation :

Explanation Not Provided