Question 11.

The area of the cross-section of a road fully in banking shown in the given figure, is

A.

 [sb² + r² (2bd + sd)²]/(r² - s²)

B.

 [sb² + r² (2bd + sd)²]/(r² - s²)

C.

 [sb² + r² (2bd + sd)²]/(r - s)

D.

 None of these

Explanation :

Explanation Not Provided

Question 12.

A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

A.

 500 m3

B.

 1000 m3

C.

 1500 m3

D.

 2000 m3

Explanation :

Explanation Not Provided

Question 13.

The concrete work for the following part of the building of specified thickness is measured in square meters

A.

 Root slabs

B.

 Floors

C.

 Wall panels

D.

 All the above

Explanation :

Explanation Not Provided

Question 14.

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

A.

 1.5 m³

B.

 2.5 m³

C.

 3.5 m³

D.

 5.0 m³

Explanation :

Explanation Not Provided

Question 15.

The expected out turn of half brick partition wall per mason per day is

A.

 1.5 m2

B.

 2.0 m2

C.

 4.0 m2

D.

 5.0 m2

Explanation :

Explanation Not Provided